Omschrijving
This is a unique complex that looks like a city gate at the head of the pier De Pontsteiger which has 366 apartments and with public facilities on the ground floor.
De opdracht
Engineering the precast concrete walls.
Bouwjaar
2015 - 2016
Opdrachtgever
Hoco Beton B.V.
Aannemer
De Nijs en Dura Vermeer
Architect
Arons en Gelauff Architecten
Leverancier(s)
Hoco Beton
Bekijk alle projecten