Engineering precast concrete construction in KIWA Cat.3+. Components are: concrete columns, concrete beams, massive concrete floors, elevator walls, (sandwich-)facade walls, precast balconies, precast concrete stairs- and landings, detailing.
De opdracht
New built hospital Erasmus MC in Rotterdam, fased in building part East, West and Building Rg. Total floor area approximately 185.000 m2.
Bouwjaar
2009-2017
Opdrachtgever
Bouwcombinatie Erasmus MC
Aannemer
BAM – Ballast Nedam
Architect
EGM Architecten Dordrecht
Leverancier(s)
Byldis, Westo Beton, Hoco Beton
Bekijk alle projecten