Omschrijving
Hotel with an attached parking garage. The parking area is constructed with an in situ concrete basement whilst the superstructure is created using precast walls and hollow-core concrete floors.
De opdracht
Chief engineer and engineering the precast skeleton.
Bouwjaar
2010 - 2011
Opdrachtgever
Stabiel Management B.V.
Aannemer
Heembouw
Architect
BPV Architecten Wassenaar
Leverancier(s)
Westo B.V.
Bekijk alle projecten