Description
An 18-story glass tower with offices and laboratories will rise up at the Utrecht Science Park. A technical feat. Knowledge is key. The clear and open building structure stimulates cooperation, exchange knowledge and meet each other. The building is designed in a visible sustainable, green housing, in which green facilities inside and outside, as well as light, space and views, contribute to a pleasant and healthy experience of the building and surroundings.
The assignment
Engineering of the prefab concrete elements.
Construction year
2017-2021
Client
Ministerie van Volksgezondheid, Welzijn en Sport
Contractor
MEET Strukton B.V.
Architect
Felix Claus Dick Van Wageningen Architecten
Supplier(s)
Byldis B.V., Haitsma Beton B.V., MEET Strukton B.V.
All projects