Shopping mall consisting of 5 building layers. On the ground floor there are stores with (senior) appartments. On the 1st floor a courtyard with a supermarket below. The project is built in 2 phases. The first phase realized the project for 75%, in the shape of a U with the supermarket as the central point. After that the existing supermarket was demolished and the final part of the complex was executed. Special about this project is the precast concrete ornaments.
De opdracht
Design, detailing and engineering of the precast components.
Bouwjaar
2007 - 2009
Opdrachtgever
Ceres projecten
Aannemer
Dura Vermeer Bouw in Rotterdam
Architect
Architectuurgroep B.V. Ledderhof
Leverancier(s)
Waco Lingen Beton